Before you start building a residence in Kenya, there are several key approvals and permits required to ensure your project is legal, safe, and compliant with local and national standards. Skipping any of these steps can lead to heavy penalties, costly delays, or even demolition of your house.

Below is a complete breakdown of what you need before breaking ground:

1. County Government Building Plan Approval

This is the most crucial approval and the first step before you start construction.

  • What’s required:

    • Architectural drawings (signed by a registered architect).

    • Structural drawings (signed by a registered structural engineer).

    • Proof of land ownership (title deed or leasehold document).

    • Recent land search from the Ministry of Lands.

    • Land rates clearance certificate from the county.

    • Survey map and beacon certificate from Survey of Kenya.

  • What happens:

    • The county physical planning department reviews your plans against building codes, zoning laws, and land use regulations.

    • If compliant, the county issues building permits and approval certificates that legally allow you to start construction.

  • Additional county approvals may include:

    • Land use and development permits.

    • Road access and fire safety approvals.

    • Water and sewer connection permits.

2. National Environmental Management Authority (NEMA) Approval

  • An Environmental Impact Assessment (EIA) report must be prepared by a licensed environmental expert and submitted to NEMA.

  • NEMA approval ensures your project complies with the Environmental Management and Coordination Act, protecting both the community and the environment.

  • For standard single-family homes on regular plots, NEMA approval is sometimes waived, but it is mandatory for larger projects (e.g., apartments, gated estates, or houses near sensitive areas such as rivers and forests).

3. National Construction Authority (NCA) Project Registration

  • All construction projects must be registered with the NCA.

  • Your contractor must also be NCA-registered.

  • Once registered, you receive an NCA project registration certificate, which is required before you can break ground.

  • NCA officers also conduct site inspections during construction to ensure compliance with approved plans and safety standards.

4. Survey Plan and Beacon Certificate

  • A registered surveyor must prepare a survey plan to define your land boundaries.

  • The beacon certificate confirms that your plot is properly demarcated and helps prevent boundary disputes.

  • This document is required during the county building plan approval process.

5. Public Health Approval

  • Issued by the County Public Health Department, this ensures that your project meets sanitation, drainage, and waste management standards.

  • It is a key step in safeguarding the health of future occupants and the surrounding community.

6. Utility Connection Approvals

  • Water connection approval – from your local water service provider.

  • Sewer connection approval – if available; otherwise, approval for septic tank or soak pit construction.

  • Electricity connection – from Kenya Power, typically applied for once construction is nearing completion.

7. Special Approvals (If Applicable)

Some projects require extra permits, depending on their location or scale:

  • Building near airports, railways, highways, or gazetted protected areas.

  • Projects involving foreign contractors or high-risk structures.

  • Large-scale housing projects may require public notices and community engagement.

8. Final Compliance and Occupation Certificates

  • Compliance Certificate – issued after inspections confirm that your building has been constructed in line with approved designs and regulations.

  • Occupation Certificate – issued by the county government, officially authorizing the use of the residence. Without this, your house is technically not legally habitable.

Timelines and Practical Tips

  • The approval process can take anywhere from a few weeks to several months, depending on the county, project size, and documentation quality.

  • Engaging qualified professionals (architects, engineers, surveyors, and contractors) is essential for smooth navigation of the process.

  • Starting construction without proper approvals risks stop orders, fines, or demolition of your house.

Before starting construction on a residence in Kenya, you must secure the above essential approvals. When they are in place, you can confidently begin your building journey knowing your project is safe, compliant, and protected by law.

If you found this guide helpful, share it with someone who’s planning to build. And if you’d like more practical tips on navigating the home-building process in Kenya, be sure to subscribe to Builder Jane for our latest articles and insights.